1. 机械拌合,设备与工具:强制式搅拌机、水桶磅秤、振动棒、工具锨、手推车等。
1. Mechanical mixing, equipment and tools: forced mixer, bucket scale, vibrator, tool shovel, trolley, etc.
2. 施工用水量:钢纤维浇注
型托辊 吸水树脂 天津水处理设备 邯郸断桥铝门窗 唐山防水 检查井模具 沟盖板模具料加水量应控制在7-8%,需用纯净饮用水。
2. Construction water consumption: the water consumption of steel fiber
castable shall be controlled at 7-8%, and pure drinking water is
required.
3. 施工环境温度要求与控制:施工现场温度必须在10-25摄氏度之间,如施工现场温度低于10摄氏度需采用升温保暖措施即可施工。如施工现场温度高于30摄氏度,须采用必要降温措施方可施工。否则会造成本产品施工困难或性能下降,不易施工。
3. Construction environment temperature requirements and control: the
temperature of the construction site must be between 10-25 ℃. If the
temperature of the construction site is lower than 10 ℃, the
construction can be carried out by heating and keeping warm measures. If
the temperature on the construction site is higher than 30 ℃, necessary
cooling measures shall be taken before construction. Otherwise, it will
cause construction difficulties or performance degradation of the
product, and it is not easy to construct.
4.拌合:先将散装料与袋内小包倒入搅拌机中干混3-5分钟使之拌和均匀,按规定的加水量,准确称出每次拌合所需用水,倒入已拌合的干料中,充分搅拌,时间不少于1--3分钟,使之具有适宜的流动性。
4. Mixing: first, pour the bulk material and the small bag in the bag
into the mixer for dry mixing for 3-5 minutes to make it evenly mixed.
Accurately weigh the water required for each mixing according to the
specified amount of water, pour it into the mixed dry material, and mix
it fully for at least 1-3 minutes to make it have proper fluidity.